Horizontal Drilling · Miami-Dade County
Horizontal Drilling in Cutler Bay, FL
New fiber, power, water, sewer and gas lines reach buildings in Cutler Bay underground, and in Miami-Dade the straight line from the main to the meter runs through limestone under somebody's pavement. Directional drilling puts the line under all of it from two small pits.
Serving Cutler Bay · Miami-Dade County
Davis Underground Solutions, Inc.
Horizontal drilling and every other boring method, with locates, bore plan and permits handled. More about Davis Underground Solutions →
Horizontal Drilling in Cutler Bay: what gets installed
Horizontal drilling for any line that has to cross something it cannot cut through: a street, a slab, a canal, a stand of trees. Entry pit, exit pit, nothing opened in between.
Cutler Bay sits on the coastal ridge above Biscayne Bay with rock close to the surface; residential services and canal crossings are the typical job.
How a bore in Cutler Bay is done
A bore in Cutler Bay is planned backward from the product: the bend the pipe can take, the cover the permit requires under the street or the canal bottom, and the rock along the path set the entry angle and the length. Reaming passes open the pilot hole through the limestone; the pipe or conduit is pulled back on the last pass with a swivel.
Hiring a horizontal drilling contractor in Cutler Bay
Price in Cutler Bay comes down to the length of the bore, the size and material of the product, what it crosses, the cover the permit demands and how much rock is in the way. Send a sketch through the form on this page and Davis Underground Solutions, Inc. replies within 24 hours; or call (855) 520-2670 now, since estimates are free.
The full write-up for the county is on the horizontal drilling page for Miami-Dade County.
Estimates are free. Call now: (855) 520-2670.
Questions about horizontal drilling in Cutler Bay
Several conduits at once?+
Yes; a bundle pulled back through one reamed hole.
Several conduits at once?+
Yes; a bundle pulled back through one reamed hole.
How soon can a bore in Cutler Bay be scheduled?+
Small residential and commercial bores are usually on the calendar within a week or two of the site walk; crossings follow the permit. Sunshine 811 needs two full business days before the pits are dug, and the contractor files it.
Other drilling and boring services in Cutler Bay
Directional Drilling Cutler Bay
Horizontal directional drilling (HDD): a steered bore between two small pits that puts conduit, pipe and cable under roads, driveways, parking lots and landscaping with no open trench.
Directional Boring Cutler Bay
Directional boring is the small-rig end of HDD: short, shallow bores for service lines, sleeves and conduit on residential and light-commercial lots.
Underground Drilling Cutler Bay
Underground drilling for new utilities where the surface is spoken for: tracked, steered bores placed under whatever is already built on top.
Fiber Optic Cable Drilling Cutler Bay
Fiber duct and drop conduit installed by directional drill for carriers, co-ops, campuses and developments: long shots along the right-of-way, short shots to the building.
Electrical Conduit Drilling Cutler Bay
PVC and HDPE electrical conduit bored under pavement for primary feeds, secondary services, site lighting and EV charging circuits.
Underground Conduit Drilling Cutler Bay
Single ducts and multi-duct bundles pulled through one reamed bore: communications, power, controls and spares placed together under the obstacle.
Structured Cable Drilling Cutler Bay
Conduit between buildings for structured cabling, campus networks, security and controls, bored under courtyards, drives and parking rather than cut across them.
Utility Drilling Cutler Bay
Utility drilling for water, sewer, gas, power and telecom owners: permitted road crossings, mains under live streets, services to the meter.
Communications Drilling Cutler Bay
Communications conduit and cable placed by directional drill: telecom, cable TV, cell-site backhaul and private networks, under roads and lots.
Missile Boring Cutler Bay
Missile boring (pneumatic piercing) drives a steel mole through the soil for short, straight, shallow runs under a driveway or sidewalk: the quickest way to sleeve a lawn or a walk.
Auger Boring and Drilling Cutler Bay
Cased auger bores for road, highway and railroad crossings and for gravity sewer that has to hold an exact grade: a straight steel casing jacked from a pit.
Sewer, Water and Drain Lines Cutler Bay
New water services and mains, sewer force mains and laterals, and storm drains installed under roads, driveways and yards without trenching them open.
Horizontal Drilling in nearby Miami-Dade County communities
- Horizontal Drilling Leisure City
- Horizontal Drilling Naranja
- Horizontal Drilling Ojus
- Horizontal Drilling Olympia Heights
- Horizontal Drilling Palm Springs North
- Horizontal Drilling Palmetto Estates
- Horizontal Drilling Pinewood
- Horizontal Drilling Princeton
- Horizontal Drilling Richmond Heights
- Horizontal Drilling Richmond West
- Horizontal Drilling South Miami Heights
- Horizontal Drilling Sunset